Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

SR 971/Navarre Coulee Site 5 - Rock Slope Scaling
Infrastructure
Design
$300,000 CJ est. value
Chelan, WA 98816

CTC Salvage, Demolition and Restoration
Demolition, Renovation, Infrastructure - 91,023 SF
Bidding
Wenatchee, WA 98801

Big Meadow Creek Bridge
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Leavenworth, WA 98826

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Fire Protection System Upgrades and Miscellaneous Piping at the Wells Hydroelectric Project
Infrastructure
Results
$3,968,490 CJ est. value
Wenatchee, WA 98801

Chelan County Public Utility District Service Center Project - Bid Package 08.20
New Construction, Infrastructure
Construction
$105,000,000 CJ est. value
Wenatchee, WA 98801

US 12/Ackley Rd/Clover Lane - Intersection Safety Improvements
Infrastructure
Design
$1,008,000 CJ est. value
Leavenworth, WA 98826

Kenzie's Landing
New Construction, Infrastructure
Post-Bid
$1,000,000 est. value
Wenatchee, WA

US 97A/S of Entiat - Site 2 - Rock Slope Scaling
Infrastructure
Design
$394,000 CJ est. value
Entiat, WA 98822

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Kirkland, WA 98033

US 97A/S of Entiat - Site 1 - Rock Slope Scaling
Infrastructure
Design
$483,000 CJ est. value
Entiat, WA 98822

Wenatchee City Pool Liner and Plumbing Upgrade
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Wenatchee, WA 98801

Last Updated 10/25/2022 08:40 AM
Project Title

US 2 Et Al NCR Guardrail Update 21-23

Physical Address View project details and contacts
City, State (County) Leavenworth, WA 98826   (Chelan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $6,719,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Weathering steel beam guardrail is experiencing unexpected corrosion. Replace weathering steel beam guardrail with aesthetic guardrail alternatives. These actions will enhance motorist safety by reducing the severity of collisions occurring when a vehicle leaves the roadway. Included sections are: US 97 MP 152.73 to MP 178.03 and SR 2 MP 57.49 to MP 98.53. As of October 25, 2022, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the Third quarter of 2022. The contract advertisement is expected in Fourth quarter of 2022 and construction is anticipated to be operationally complete in the Fourth quarter of 2023. WSDOT - US 2 Et Al NCR Guardrail Update 21-23 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents