Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

San Souci Road Elevation Design
Infrastructure
Design
WA

Miscellaneous COF Upgrades
Infrastructure
Bidding
$470,000 est. value
Moses Lake, WA

SR 9, Bickford Ave Intersection Improvement
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

Call for Artists Highway Two Easy Street Roundabout
Infrastructure
Bidding
$175,000 to $200,000 est. value
Wenatchee, WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

Mill Avenue Overlay ES-556
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Bellingham, WA 98229

Last Updated 12/07/2021 05:01 PM
Project Title

Torbett and McPherson Watermain Replacement and Road Improvements

Physical Address View project details and contacts
City, State (County) Richland, WA 99354   (Benton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,250,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the construction of new water main replacement (water main and services) along McPherson Ave and Torbett Street, water services along McPherson and Marshall along with reconstruction of 1250 LF of Torbett, 850 LF of McPherson, and asphalt overlay of 850 LF of McPherson. Work includes installation of approximately 4300 LF of new 8" PVC water mains, 173 water services (residential), fire hydrants, road reconstruction to residential street standards, gutter grind, street overlay, ADA ramps, storm drainage, sewer services and manholes, site restoration and other incidental work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents