Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Oak & 19th Intersection Improvements - SIF147 - City of Bozeman
Alteration
Conception
$750,000 est. value
Bozeman, MT 59718

2022 North 7th Avenue Water Renovations
Infrastructure
Design
$427,000 CJ est. value
Bozeman, MT 59715

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

RFQ Design - AE Services - Gianforte Hall, School of Computing Building - MSU Bozeman
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Bozeman, MT 59715

Headwaters Trail System Crack Seal and Seal Coat - 2022
Infrastructure
Bidding
$200,000 CJ est. value
Three Forks, MT 59752

Gallatin County Courts Building - All Trades
Demolition, New Construction, Infrastructure - 65,000 SF
Sub-Bidding
$24,000,000 CJ est. value
Bozeman, MT 59715

Call for Art for Intersection Art Project
Term Contract
Sub-Bidding
Bozeman, MT 59715

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Northwest Crossing Phase 1
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bozeman, MT 59715

Northwest Crossing Phase 1
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bozeman, MT 59715

Last Updated 08/04/2022 12:01 AM
Project Title

Oak (Flanders Mill to Ryun Sun Way) - SIF057 - City of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59718   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2020
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the completion of the street segment of Oak St, from Flanders Mill to Ryun Sun Way, to a five-lane urban principal arterial standard. This project increases capacity directly by constructing new segments of arterial roadway and by adding additional lanes, dedicated bike lanes and sidewalks. Future developments in this area may not be allowed to proceed until these improvements are in place. Functionality of the network at large is dependent on this element functioning as intended. The incomplete transportation network in this vicinity is putting unnecessary demand on those elements of the street network that are in place. This project will complete an important east-west link between Ferguson and Cottonwood, and conformance with the Transportation Master Plan will be attained. A payback District or SID may be created to leverage other stakeholders. Other affected projects include intersection improvements at Oak and Cottonwood, Oak and Flanders Mill, Oak and Ferguson, Oak Street - New Holland to Ferguson. The project was included in the city's 2020-2024 Capital Improvement Program (CIP). As of August 21, 2020, the project was not included in the 2021-2025 CIP and further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents