Similar Projects
Asphalt and Sidewalk Rehabilitation
Infrastructure
Bidding

I-95 on-Ramps - Add Left Turn Lane(s)/Milling and Resurfacing/Base Work/Drainage Improvements
Infrastructure
Bidding
$4,010,531 est. value
FL

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Design Build Push Button Contract No. 2 - Program Management
Results

Pineapple Complete Streets Project
Results
$1,119,730 est. value
Melbourne, FL 32935

FPL Cocoa Service Center Paving Improvements
Alteration
Post-Bid
Cocoa, FL 32922

Front Street Complete Streets Project
Results
Melbourne, FL 32901

Road Bond Paving - Unit 48 and Emerson Drive
Infrastructure
Post-Bid
$5,800,328 est. value
Palm Bay, FL 32907

Asphalt Sealing, Rejuvenation, and Striping
Term Contract
Results
Melbourne, FL 32940

Silicone Joint Sealer
Infrastructure
Post-Bid

Pavement Repair - Titusville High School
Results
Titusville, FL 32780

Road Bond Paving - Unit 24 and 25
Results
Less than $14,269,980 est. value
Palm Bay, FL 32907

Road Bond Paving - Unit 17
Results
Less than $1,987,130 est. value
Palm Bay, FL 32907

Road Bond Paving - Units 1, 2, 3, 4, 27, 35, 43 and 47
Results
Less than $4,310,375 est. value
Palm Bay, FL 32907

Last Updated 02/21/2022 08:08 AM
Project Title

Road Bond Paving - Unit 20

Physical Address View project details and contacts
City, State (County) Palm Bay, FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,157,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of 1.5” milling and paving and 1” thin lift asphalt overlay for streets in Unit 20. All streets in Unit 20 are within the City of Palm Bay Right of Way. Construction shall include all incidentals items for work to be performed as per the construction plans for the roadways in Unit 20 to include: milling and paving, thin lift paving, any utility adjustments, sidewalk connections and ADA additions, temporary striping and final thermoplastic striping and pay quantities provided.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents