Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

NM 74 - PoPay Avenue Intersection Project
Infrastructure
Bidding
$1,052,575 CJ est. value
Ohkay Owingeh, NM 87566

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

La Madera Road Improvements
Infrastructure
Post-Bid
La Madera, NM

Rainbow Boulevard Improvements Project
Infrastructure
Results

Acequia De La Canova Culvert Replacement Project
Infrastructure
Results
$55,403 CJ est. value
Canova, NM 87582

Voluntary Public Access- Habitat Initiative
Infrastructure
Construction
Santa Fe, NM 87506

Los Pinos Bridge Project
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Tierra Amarilla, NM 87575

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2022
Infrastructure
Post-Bid
$100,000 CJ est. value
Espanola, NM 87532

RFQ/P Contractor - Construction of a New Community and Wellness Center
New Construction, Infrastructure - 8,758 SF
Post-Bid
$2,178,975 CJ est. value
Ohkay Owingeh, NM 87566

RFP D/B - Santa Clara Pueblo Tribal Administration Complex
New Construction, Infrastructure
Post-Bid
$13,200,000 CJ est. value
Espanola, NM 87532

RFQ Contractors - 382 Fencing
Infrastructure
Post-Bid
$600,000 CJ est. value
Espanola, NM 87532

MB Community Ditch Association Rio Chamita Diversion Dam
New Construction, Infrastructure
Post-Bid
$318,778 CJ est. value
Chama, NM 87520

Installation of a Livestock Pipeline, Drinking Troughs and Storage Tanks
Infrastructure
Post-Bid
$875,000 CJ est. value
Abiquiu, NM 87510

Roadway Reconstruction
Infrastructure
Post-Bid
$600,000 CJ est. value
Tierra Amarilla, NM 87551

Last Updated 03/01/2023 03:33 PM
Project Title

Riley Road Improvements - 36621 - Torrance County

Physical Address View project details and contacts
City, State (County) Espanola, NM 87532   (Rio Arriba County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Torrance County plans to repair and pave Riley Road from the intersection of State Highway 55 to the intersection of State Highway 542. The renovation of Riley Road, which is currently chip-sealed, requires 3-inches of asphalt paving for a 6-mile stretch, 20-feet wide. The chip-sealed surface will provide a solid base. The road has been previously re-claimed and re-chipped; however, vehicles that exceed the weight limit frequently use the road causing new damage. Weight limit signs have been vandalized and torn down. Asphalt paving will increase the weight limit to accommodate semitrucks. An estimated 700-800 vehicles use the road daily. Riley Road provides a quick connection between the two highways without traveling 10 miles east to State Highway 41 or 7 miles west to the portion of Highway 55 that parallels the Manzano Mountains. The road is also used as an evacuation route during wildfires and provides convenient access for emergency vehicles and for the road department to access supplies such as gravel and caliche. The project will be completed as a stand-alone project. Since the roadway is an existing roadway, it does not require engineering or planning. Traffic control is planned for the duration of the project which is anticipated to take 16 work days barring weather delays. No maintenance costs are expected during the first five years following project completion As of April 1, 2021, this project is currently in the FY 2022-2026 CIP. Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents