Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

The Sanctuary at James H Shimberg Estates Parking Lot Resurfacing
Infrastructure
Bidding
Tampa, FL 33604

Ybor City Streetscape Improvements - 7th Avenue from 24th Street to 26th Street
Infrastructure
Bidding
$789,000 est. value
Tampa, FL

I-75 MLK DDI
Post-Bid
FL

City Parking Lot Projects
Post-Bid
Plant City, FL 33563

FY19 CDBG Area Proposed Sidewalk Improvements Design-Build
Results
Less than $735,407 est. value
Temple Terrace, FL 33617

Sidewalks Construction Near Kenly Elementary - Various Locations (LAP)
Results
Less than $346,108 est. value
Tampa, FL 33619

Continuing Contract for Miscellaneous Concrete Flat Work
Term Contract
Post-Bid
Temple Terrace, FL

Sidewalks Near Mort Elementary - Various Locations (LAP)
Results
Less than $573,976 est. value
Tampa, FL 33613

Curb/Sidewalk Maintenance and Restoration (SMS)
Infrastructure
Post-Bid
Tampa, FL

Sidewalk Construction - Gibsonton Elementary (LAP)
Results
Less than $346,198 est. value
Gibsonton, FL 33534

Sidewalk Construction - Lutz Lake Fern Road Trail (LAP)
Results
Less than $94,668 est. value
Tampa, FL 33600

Midtown District Development
Results
Plant City, FL

Flexible Paving/Cement Concrete Pavement/Widening of Existing Entrance and Exit Ramps at I-75 SB Rest Area
Results
Less than $13,085,100 est. value
FL

Boardwalk Repair and Maintenance
Results
Less than $450,000 est. value

Last Updated 07/07/2021 10:23 AM
Project Title

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)

Physical Address View project details and contacts
City, State (County) Ruskin, FL 33570   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,249,150
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Section 3, Township 32 S and Range 19 E in Ruskin within unincorporated Hillsborough County. This project includes the construction of a 12-foot wide paved asphalt trail, including a 492-foot long pedestrian bridge, that extends 1.2-miles between East Shell Point Road and 19th Avenue NE and is part of the regional north-south trail connectivity between Hillsborough and Manatee Counties. The project will also include signing and pavement markings, and trail amenties such as landscaping, benches, bike racks and shade shelter, which are detailed in the signed and sealed plans.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents