Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

I-75 Big Bend Road
Bidding
FL

I-75 MLK DDI
Bidding
FL

US 301 Bloomingdale
Post-Bid
FL

Forest Brooke Subdivision, Phase 3C and Collector Road 2nd Extension, Phase 1
Post-Bid
Wimauma, FL

North Franklin and West English Streets Improvements
Results
Plant City, FL 33564

Prequalification in Hot Plant-Mixed Bituminous Courses Required
Results
Less than $264,727 est. value
FL

General Asphalt Resurfacing
Term Contract
Bidding
Temple Terrace, FL

CDBG Project for Streets Resurfacing
Post-Bid
Plant City, FL

Inspection, Management and Performance of I-4, I-275, I-75, I-375, and I-4 Connector in Hillsborough and Pinellas Counties
Results
Less than $39,856,572 est. value

East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

Turkey Creek Road Project
Post-Bid
$3,000,000 est. value
Plant City, FL 33566

Asphalt Milling Services
Results
Less than $475,000 est. value
Tampa, FL 33601

Roadway Restoration - Water Department
Term Contract
Bidding
$650,000 est. value
Tampa, FL

Villages N and P Infrastructure Construction Project
Post-Bid
Tampa, FL

Last Updated 08/31/2020 10:44 AM
Project Title

Wheeler Street Improvements

Physical Address View project details and contacts
City, State (County) Plant City, FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $340,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Improvements under this Contract consist of resurfacing of North Wheeler Street from Spencer Street to West Hillsboro Street, along with adding a six (6) foot concrete sidewalk on the west side of the roadway from the cemetery entrance to north of West Hillsboro Street. Additional work includes a variable height retaining wall with a decorative pedestrian rail above and adjacent to the retaining wall. Existing curb and gutter will remain and be pressure washed. Project limits will be closed during construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents