Project Title | RFP D/B - I-4 (SR 400) at Sand Lake Road Interchange from West of SR 528 to West of SR 435 & I-4 (SR 400) from West of Central Florida Parkway to West of SR 528 |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32829 (Orange County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction Commenced, Construction start expected February 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $218,341,429 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The owner has selected a Design Builder. The scheduled start date is 2/28/2023 and estimated completion date 12/9/2026. Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 7 -- Drainage (includes all storm drains, pipe culverts, culverts, culverts, etc.) 11 -- Grading (includes clearing and grubbing, excavation, and embarkment). 24 -- Major Bridge - Curved Steel Girders 25 -- Major Bridge - Multi-Level Roadways I-4 @ Sand Lake Road Interchange TRC Members (Subject to Change) : Ed Kestory Kevin Hayden Paul Wabi The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the I-4 (SR 400) at Sand Lake Road Interchange from West of SR 528 to West of SR 435 & I-4 (SR 400) from West of Central Florida Parkway to West of SR 528 Project in Orange County. Contract Amount/Limit: $193,990,083.00 - Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. Estimated Contract Time: 1,280 Calendar Days Stipend Amount: $437,981.00 In accordance with Conflict of Interest Procedure for Department Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Five Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Prime: Jacobs (Contract Number C9I87); Subconsultants: Ardaman and Associates, Inc., WBQ Design and Engineering, Inc., Florida Bridge and Transportation, Inc., OM Engineering Services, Inc. Prime: Stantec (Contract Number CA000); Subconsultants: RS&H Inc., Kittelson & Associates Inc., Traffic Engineering Data Solutions, Inc. (TEDS) PREQUALIFICATION REQUIREMENT UNDER RULE, 14-22 F.A.C.: Work Class 7 Drainage, Work Class 11 Grading, for this project contractors must be prequalified in either Work Class 24 Major Bridge - Curved Steel Girders OR Work Class 25 Major Bridge - Multi-Level Roadways Exempt Documents are available for this project. To receive the documents, please download, complete the Exempt Documents Request Form No. 050-020-26, and submit it along with a copy of the requestor's photo ID as specified per the form to Angie Richards in the Procurement Office at d5.designbuild@dot.state.fl.us. The documents will be emailed to you upon receipt of this form. For project information and marketing meeting availability, please follow the link to our Consultant Acquisition Plan website All questions for this project must be submitted through the Department's Bid Question and Answer website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Reference Contract Number E59A6. You are responsible for monitoring this site for questions and answers throughout the procurement process. Financial Management Number(s) 444315-1-52-01, 444315-3-52-01 Phase I Selection Date/Time 12/06/2021 Pre-Proposal Meeting Date/Time 12/21/2021 Tech Proposal Due Date/Time 9/09/2022 Bid Price Due Date/Time 11/01/2022 Bid Opening Date/Time 11/01/2022 Final Selection Date/Time 11/07/2022 FDOT - RFP D/B - I-4 at Sand Lake Road Interchange The Department of Transportation has an overall, race-neutral DBE goal |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |