Similar Projects
Michael Etchison Connector - City of Monroe
Infrastructure
Conception
$1,200,000 CJ est. value
Monroe, GA 30655

Alcovy River Gravity Sewer - City of Monroe
Infrastructure
Conception
$4,000,000 CJ est. value
Monroe, GA 30655

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Jacks Creek Landing
New Construction, Infrastructure
Design
$105,000,000 CJ est. value
Monroe, GA 30655

Water Main Center Hill Church Road
Infrastructure
Bidding
$500,000 CJ est. value
Monroe, GA 30655

Marco Estates Sewerage System Improvements
Infrastructure
Bidding
$830,000 CJ est. value
Social Circle, GA 30025

Rivian Phase I Grading
Infrastructure
Post-Bid
$100,000 CJ est. value
Monroe, GA 30655

Blaine Station Development
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Monroe, GA 30655

2021 LMIG Paving Project
Infrastructure
Results
$378,334 CJ est. value
Loganville, GA 30052

Destination Park Sidewalk, Utility, and Site Improvements - Phase 1
Infrastructure
Results
$1,199,999 CJ est. value
Loganville, GA 30052

Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Social Circle, GA 30025

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Twin Forks
New Construction, Infrastructure
Pending Verification
$22,500,000 CJ est. value
Loganville, GA 30052

South Cherokee to Spring Street Tank 12" Water Main Replacement - City of Social Circle
Infrastructure
Conception
$420,000 CJ est. value
Social Circle, GA 30025

Last Updated 07/11/2023 10:35 AM
Project Title

Hard Labor Creek Regional Reservoir Project Dam Site Safety Buoy System Repairs

Physical Address View project details and contacts
City, State (County) Monroe, GA 30655   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall include a method of approach, equipment planned for repair work, and costs for associated work required to restore the safety buoy system to the original configuration. WCWSA possesses replacement buoys and components of the buoy connection hardware for the connection to each individual buoy that are a part of the safety buoy system, but any additional materials and all labor, tools, equipment, and any other miscellaneous items are necessary for the repair of the buoy system at the Hard Labor Creek Regional Reservoir Dam site, located in southeast Walton County, shall be included.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents