Similar Projects
Stream Restoration of Tusico Branch (Phase 2)
Bidding
Fairfax, VA

Herndon Metrorail Intermodal Access Improvements Project
New Construction
Bidding
Herndon, VA

Piney Branch Stream Restoration - Construction
Post-Bid
Vienna, VA 22160

Spring 2019, Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
Fairfax, VA 22035

Restoration Project of Accontick Creek
Results
Fairfax, VA

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Drainage Improvements Fairfax Camp 30 AHQ Maintenance Facility
Post-Bid
Fairfax, VA 22030

Pedestrian and Drainage Project
Results
$4,467,755 est. value
Fairfax, VA

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Stream Bank Stabilization at Mason`s Shenandoah Parking Garage
Results
Fairfax, VA 22030

Tusico Branch Stream Restoration
Results
Fairfax, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Concrete Pipe/ NOVA Infrastructure
Term Contract
Results

Plain Concrete and Storm Drainage Construction
Results
Herndon, VA

Concrete Pipe
Term Contract
Results

Last Updated 11/18/2020 02:26 PM
Project Title

Pohick Stream Valley Trail Hillside to Burke Station

Physical Address View project details and contacts
City, State (County) Fairfax, VA 22035   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $690,000
Plans Available from County Agency - 10/23/20
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include minor site demolition, clearing, E&S controls, earthwork, grading, asphalt and concrete paving, culvert installation, fiberglass bridge installation, retaining wall, riprap, signs, seeding and mulching, and related work. Contractor to provide structural engineer of record (SER), final plans, and foundation engineered drawings, and building permit for retaining wall.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents