Similar Projects
STPA Wing Construction
New Construction
Conception
Edinburg, TX

Murphy USA #5727 / Edinburg
New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Edinburg, TX 78539

14 Elementary Gym Renovations
Renovation
Design
Edinburg, TX

La Joya ISD Esser Funds - Canopy Structures Phase 3
Infrastructure
Design
$98,000 CJ est. value
La Joya, TX 78560

Intersection Improvements on SS 115 (23RD Street) and SH 336 (10th Street) - Rebid
Infrastructure
Bidding
$374,071 CJ est. value
McAllen, TX 78504

RFP Engineering - Hidalgo County Regional Mobility Authority 365 Toll Collection System Installation, Integration, and Maintenance
Infrastructure
Bidding
$5,300,000 CJ est. value
Pharr, TX 78577

Moving Portable Buildings
Term Contract
Post-Bid
Edinburg, TX

Taco Bell / Mission
New Construction, Infrastructure - 2,400 SF
Post-Bid
$750,000 CJ est. value
Mission, TX 78572

Psja Isd Baldemar G Cano Central Kitchen Complex Canopy Additions
Addition
Results
$241,600 est. value
Pharr, TX 78577

Beethoven Secondary and Rembrandt Early Childhood Building Construction
New Construction
Results
Pharr, TX

Habitat At Grove Apartments
New Construction, Infrastructure - 130,000 SF
Construction
$14,000,000 CJ est. value
McAllen, TX 78501

Quick Quack Car Wash / Donna
New Construction, Infrastructure - 4,189 SF
Construction
$500,000 CJ est. value
Donna, TX 78537

7 Eleven / McAllen
New Construction, Infrastructure - 4,754 SF
Pending Verification
$1,640,000 CJ est. value
McAllen, TX 78501

Scooters Coffee #1683
New Construction, Infrastructure - 664 SF
Pending Verification
$350,000 CJ est. value
Mission, TX 78572

Just A Closet #7 / Pharr
New Construction, Infrastructure - 69,175 SF
Design
$2,000,000 CJ est. value
Pharr, TX 78577

Last Updated 09/29/2022 09:03 AM
Project Title

Brewster School LED Lighting Improvements

Physical Address View project details and contacts
City, State (County) Edinburg, TX 78541   (Hidalgo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $345,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Trustees of the Edinburg Consolidated Independent School District is accepting bids. Lighting Improvements.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents