Similar Projects
Last Updated | 08/16/2022 10:04 AM |
Project Title | 2022 Sewer Lining Program |
Physical Address | View project details and contacts |
City, State (County) | Des Moines, IA 50309 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,945,436 [brand] Estimate |
Plans Available from | Civil Engineer - 07/18/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For consideration by the City Council (Council) at its meeting on September 12, 2022. The City of Des Moines (Jurisdiction) reserves the right to reject any and all bids. The City of Des Moines is pleased to provide accommodations to individuals with disabilities or groups and encourages participation in City government. To better serve you, please notify us at least three business days in advance when possible at 515-283-4209, should special accommodations be required. Work on each improvement shall be commenced upon approval of the contract by the Council, and completed as stated below. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Iowa Code and as specified by the Jurisdiction. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. The improvement includes the rehabilitation of approximately 12,000 lineal feet of 8-inch through 48-inch diameter sanitary sewers with cured-in-place pipe (CIPP) lining, bypass pumping, sewer cleaning and televising, sewer spot repairs, sewer spot lining, manhole rehabilitation, and other related items; all in accordance with the contract documents, including Plan File Number 643-161/181, at the following locations: Fleur Drive, Grand Avenue, Ingersoll Avenue, 42nd Street, Allison Avenue, Ravina Drive, Waverly Drive, Riverview Drive, Oak Park Avenue, 16th Street, Clinton Avenue, Madison Avenue, 9th Street, 6th Avenue, 8th Street, 1st Street, Bowdoin Street, 3rd Street, Columbia Street, Cornell Street, Hull Avenue, Creston Avenue, and Meredith Drive, in Des Moines, Iowa. This project shall be fully completed not later than September 15, 2023, and in accordance with the Completion Provisions. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |