Similar Projects
Road Bond Paving - Unit 48 and Emerson Drive
Infrastructure
Bidding
$5,800,328 est. value
Palm Bay, FL 32907

Resurfacing
Infrastructure
Bidding
FL

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Economic Development Transportation Project Fund (EDTPF) Infrastructure Improvements Roadway Package
Results
Cape Canaveral, FL 32920

Design Build Push Button Contract No. 2 - Program Management
Results

Asphalt Repair
Infrastructure
Bidding
$440,000 est. value
FL

FPL Cocoa Service Center Paving Improvements
Alteration
Post-Bid
Cocoa, FL 32922

Pineapple Complete Streets Project
Results
$1,119,730 est. value
Melbourne, FL 32935

Road Bond Paving - Unit 20
Infrastructure
Bidding
Palm Bay, FL

Govan Avenue Road Paving
Infrastructure
Post-Bid
Grant Vlkria, Malabar, FL 32950

Front Street Complete Streets Project
Results
Melbourne, FL 32901

2022 Annual Road Resurfacing
Term Contract
Post-Bid
Titusville, FL

Asphalt Sealing, Rejuvenation, and Striping
Term Contract
Results
Melbourne, FL 32940

West Central Boulevard Improvements
Results
$1,400,000 est. value
Cape Canaveral, FL 32920

Last Updated 01/19/2022 09:35 AM
Project Title

Road Bond Paving - Driskell Heights, Florida Avenue, and Farview Subdivision

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $951,544
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of roadway milling 1.5” asphalt and then paving 1.5” asphalt overlay for streets in Driskell Heights and Farview Subdivision in the City of Palm Bay. The roadway improvements will include 1.5” mill and pave of the entire two travel lanes within Driskell Heights and Farview Subdivison. All streets are within the City of Palm Bay Right of Way. Roadway Full Depth Reclamation (FDR) and 1.5” paving project. The project limit is from Lipscomb Street to the eastern cul-de-sac approximately 2,939 linear feet. include all incidental items for work to be performed as per the construction plans for the roadways including milling and paving, utility adjustments and ADA additions, temporary striping and final thermoplastic striping and pay quantities provided in each of the bid documents. The selected contractor shall furnish and install all construction work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents