Similar Projects
Baseball and Soccer Field Upgrades - 2020 Bond - Lane Community College
New Construction
Conception
$1,000,000 est. value
Eugene, OR 97401

Sorosis Park - Phase 1 Improvements
Infrastructure
Bidding
$905,000 est. value
The Dalles, OR 97058

General Contractor for Riverbend Park Access and Restoration
Renovation
Bidding
$220,000 est. value
Bend, OR 97702

Parks and Recreation and Playground Equipment, Installations and Related Goods and Services
New Construction
Post-Bid
Salem, OR

Milwaukie Bay Park Project
Renovation
Post-Bid
$325,000 est. value
Milwaukie, OR 97222

Chip Ross Natural Area Trail Construction
New Construction, Infrastructure
Results
$100,000 est. value
Corvallis, OR 97333

Mill Park Development Project - CMGC
Renovation
Results
$5,900,000 est. value
Portland, OR 97266

Jefferson High School Gym Bleacher Replacement
Renovation
Post-Bid
$350,000 est. value
Jefferson, OR 97352

Harrison Park Copper Replacement
Renovation
Results
Portland, OR 97216

Southridge High School JV Softball Field Upgrades
Renovation
Post-Bid
$100,000 est. value
Beaverton, OR 97008

Errol Heights Park
Renovation
Results
Portland, OR 97206

RFP Construction Manager - Construction Manager General Contractor (CMGC) Services: 53rd Avenue Park West
Alteration
Post-Bid
$10,500,000 est. value
Hillsboro, OR 97124

Umpqua Dunes Campground - North Loop Rehabilitation
Renovation
Results
Winchester Bay, OR 97467

Construction Manager General Contractor (CMGC) - Waterfront Improvements Project
Infrastructure
Post-Bid
$3,000,000 est. value
Albany, OR

Quartz Neighborhood Park PK2001
Renovation
Results
$2,700,000 est. value
Redmond, OR 97756

Last Updated 06/29/2022 12:55 AM
Project Title

Skinner Butte Park Steps Repair

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000 to $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work includes two concrete step repair projects at the top and bottom of an existing trail near the Skinner Butte Park Summit. The Upper Stairs location includes construction of concrete steps flatwork to connect the existing summit parking area to a recently renovated trail and installation of basalt columns and boulders to stabilize the surrounding slope. The Lower Stairs location work includes repair of existing concrete steps and construction of new concrete flatwork as well as installation of basalt columns and boulders to stabilize the surrounding slope.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents