Similar Projects
Pedestrian Safety Improvements
Bidding
Poughkeepsie, NY 12601

Special Surface Treatment and Sidewalks
Bidding
$1,100,000 est. value
East Fishkill, Lagrange, Poughkeepsie, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Parking Lot Improvements at Dutchess County Stadium
Post-Bid
Wappingers Falls, NY 12590

One Lagrange Avenue Parking Lot Renovations
Results
Poughkeepsie, NY

Route 52 Park and Ride Lot Improvement/ Expansion Project
Results
Less than $2,100,000 est. value
East Fishkill, NY 12533

Millerton Main Street Sidewalk Replacement Project
Bidding
NY

Hudson Hall Walkway Replacement
Term Contract
Post-Bid
Poughkeepsie, NY 12601

Empire State Trail: Wallkill Valley Rail Trail to Northern Dutchess County Line
Results
Less than $3,400,000 est. value
Kingston, Red Hook, Rhinebeck, Tivoli, Ulster, NY 12401

Scattered Sidewalk, Program Repair and Restoration
Post-Bid
Poughkeepsie, NY 12602

Transportation Alternative Program (TAP) Pedestrian Safety Improvements Route 9D, West Main Street
Results
$400,000 to $500,000 est. value
Wappingers Falls, NY 12590

Liberty Street Parking Lot Improvements
Post-Bid
Poughkeepsie, NY 12601

Accessibility Improvements to the Town Hall
Results
Poughquag, NY 12570

2020 J. H. Ketcham Memorial Park Driveway and ADA Parking
Post-Bid
Dover Plains, NY 12522

Boat House Exterior Improvements
Results
Wappingers Falls, NY 12590

Last Updated 11/10/2020 08:52 AM
Project Title

Replacement and Extension of Elm Street and Charles Colman Boulevard Sidewalk

Physical Address View project details and contacts
City, State (County) Pawling, NY 12564   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $461,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally consists of the following work: This project consists of removal and installation of concrete sidewalks and curbing. This project includes installation of concrete sidewalk and curbing located along portions of Elm Street and Charles Colman Blvd. The project may include but not be limited to, saw cutting, removal and disposal, curbing, sidewalk, ADA ramps and limited paving.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents