Similar Projects
Newport Pointe Lift Station Phase 1
Bidding
TX

Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Booster Pump Replacement
Results

Existing Lift Station Nos. 2 and 3 Electrical Modifications, Generator, and Motor Control Center Replacement
Results
$300,000 est. value
Houston, TX 77040

Construction Services - Surface Water Supply Project - Central Pump Station and RePump Station
New Construction
Bidding
TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Construction of Proposed Wastewater Lift Station No. 2 and 6" Force Main Serving Anderson Lake Development
Results
TX

HPW - Various Well Sites and Re-Pump Stations - Package 2
Renovation
Bidding
$10,266,600 est. value
Houston, TX

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Marvida Lift Station No. 1
Results
Less than $987,000 est. value
TX

Lift Station Nos. 1, 2, 3, and 4 Improvements
Renovation
Bidding
$570,000 est. value
Spring, TX 77379

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

HPW-Abandonment of Bering and San Felipe Lift Stations
Results
$20,573,123 est. value
Houston, TX 77002

Last Updated 01/21/2022 09:49 AM
Project Title

Lift Station Renewal and Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,324,168
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for this project includes the replacement of Magnet and Rehabilitation of Westpark and MacGregor lift stations. The rehabilitation includes site work, pumps, piping, valves, support, instrumentation and electrical improvements.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents