Similar Projects
Reported | 08/08/2021 12:00 AM |
Project Title | JSOC Operations Facility Annex |
Physical Address | View project details and contacts |
City, State (County) | Fort Bragg, NC (Cumberland County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct a JSOC Operations Facility Annex. The scope of work includes: Construct a new 25,260 SF Operations Facility Annex. The scope of this project is to construct an Operations Facility that includes administrative, mission planning areas, vehicle bays, climate controlled pallet storage with lift, Petroleum, Oil and Lubricants storage, arms vaults, individual unit caged storage, engineering workshops, latrines with lockers, and laundry. Also includes space for a Secure Compartmentalized Information Facility with administrative area, 50-person classroom, operations center, and Special Access Programs. Project will also provide fire alarm/mass notification, fire suppression system, telephone and advanced unclassified and classified communications networks, intercom system, closed circuit surveillance and electronic access control systems, integrated commercial intrusion detection system, cable TV, a protected distribution system, and connection to the energy management control system. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Supporting facilities include site development, utilities and connections, lighting, lightning protection system, walks, curbs and gutters, vehicle parking, access road, bus access area, storm drainage, landscaping, fencing and other site improvements. Supporting facilities are costlier due to long utility runs to the remote project site. Heating and air conditioning will be provided by a self-contained systems. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Electronic security systems and audio visual services are included. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included. No demolition or disposal is included in this project. Air Conditioning (Estimated 25 Tons) Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. |
||||||||||||||||||||||||||||||||||||
Details | 1 Military Facility, 25,260 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |