Project Title | Lake Ella Road Safety Improvements |
Physical Address | View project details and contacts |
City, State (County) | Fruitland Park, FL 34731 (Lake County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,041,727 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnishing of All Services, Labor, Materials and Equipment for the Construction of the Following Project: Lake Ella Road Safety Improvements This Projects Scope Includes Construction of 8-foot-wide (4-foot-paved: Type B Stabilization, Base, Super Pave Asphaltic Concrete, and Frictional Course With a Safety Edge) Shoulders Along Lake Ella Road From Micro Racetrack Road to Rolling Acres Road for Approximate 2,600 Lf. The Paved Shoulders With Asphalt Safety Edge Will Be Installed on Both Sides Within the Existing Right of Way. Shoulders Are to Be Added Along South Side Along the Reverse Curves at Mares Tail Lane for 700 Lf and Both Sides of the Curve at Padgett Lane for 840 Lf. The Length of Improvements Is 4,140 Lf (0.78 Miles). Additional Construction Activities Include Asphalt and Concrete Driveway Reconstruction, Adding Mailboxes, Fencing, Adding Drop Curb and Removal of Existing Concrete. The Scope Also Includes Installation, Removal and Relocation of Signage, Flexible Tubular Delineators, Raised Pavement Markers, and Pavement Markings. Other General Construction Activities Are Mobilization, Maintenance of Traffic, Earthwork, Sodding, Erosion Control, Tree Removal, Minor Drainage Work. This Project Is Funded Through a Local Agency Program (Lap) Agreement With the Florida Department of Transportation. Bids May Be Withdrawn Prior to the Date of Opening, but No Bids May Be Withdrawn for a Period of Sixty (60) Days After the Date of Opening of Bids. The Board of County Commissioners Reserves the Right to Reject Any or All Bids, to Waive Formalities, and to Award the Contract in the Best Interest of Lake County, Florida. All Bids Must Be Accompanied by a Bid Guarantee Acceptable to the County Attorney, Which Shall Be One of the Following; Bid Bond or Letter of Credit, in the Sum of Five Percent (5%) of the Base Bid and Made Payable to Lake County. Said Bid Bond or Letter of Credit Shall Be a Guarantee That Should the Bid Be Accepted, the Bidder Will, Within Ten (10) Days After Written Notice of the Award of the Contract, Enter Into a Contract With Lake County for the Services Proposed to Be Performed and Will at That Time Furnish an Acceptable Contract Surety. Cash, Company or Personal Checks Will Not Be Accepted. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |