Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

C Line (Green) Extension To Torrance - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 CJ est. value
Torrance, CA 90503

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Technology and Health Increment 1
Term Contract, Demolition, New Construction, Infrastructure - 253,866 SF
Bidding
$120,000,000 CJ est. value
Walnut, CA 91789

CIP No. 601 Prospect Avenue Curb Ramps & CIP No. 698 Ada Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Hermosa Beach, CA 90254

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

Grayson Repowering Project - Demolition and Site Improvement
Demolition, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Glendale, CA 91201

Orchard Dale Elementary School Modernization Project- Sitework
Infrastructure
Results
Whittier, CA 90603

West Parcel Habitat Mitigation & Five Year Maintenance
Infrastructure
Results
$1,050,000 est. value
Walnut, CA 91789

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

High Desert Corridor - Los Angeles County Metropolitan Transportation Authority (LA Metro)
Alteration
Conception
$1,000,000,000 est. value
Palmdale, CA

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

San Pedro Waterfront - Berths 74-83 Promenade Phase II - Port of Los Angeles - Construction Division
Infrastructure
Bidding
$28,800,000 CJ est. value
Los Angeles, CA 90731

Last Updated 02/06/2023 03:22 PM
Project Title

RFQ D/B - Substation Projects

Physical Address View project details and contacts
City, State (County) Burbank, CA 91502   (Los Angeles County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected May 2021 , Construction documents
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Burbank ("City") has determined that all potential General Contractors (hereinafter "Contractor") for any of the following 69/12kV Substation Projects must be pre-qualified prior to receiving a Request for Proposal from the City for the projects. The two projects are: o Gas Insulated Switchgear ("GIS") 69/12 kV Substation Project ("GIS Project") o Air Insulated Switchgear ("AIS") 69/12 kV Substation Project ("AIS Project") A contractor may bid for either or both of the projects listed above as long as it meets the qualifications. Contractors that submit and qualify for the GIS Project will automatically qualify for the AIS Project if they indicate interest. The delivery method for this project is design-build. It is mandatory that all Contractors who desire to receive a Request for Proposal, and may intend to submit a proposal complete this Statement of Qualification Package (hereinafter "SOQ"), provide all the materials requested herein, and be approved by the City to be on the qualified General Contractor List. For tracking purposes only, the City refers to the proposal as a bid; however, this project is intended to be built with the design-build procurement method. This process involves providing selected Contractors with an opportunity to submit a proposal which will be weighed in a manner stated in the Request for Proposals. Requests for Proposals will only be provided to those who are on the City qualified Contractor list. GIS Project The estimated scope of work includes engineering, procurement and construction of the proposed substation with ultimate design with the capacity for up to three (3) 33.6 MVA 69/12 kV transformers, up to three (3) 69kV underground lines, and to accommodate up to a six-position 69kV GIS with ring bus configuration to be installed in an enclosed concrete masonry unit (CMU) structure. Additionally, the substation will accommodate up to three (3) sectionalized main-transfer or double bus-double breaker scheme air-insulated Arc-Resistant switchgear configuration and twelve outgoing, 12kV underground rated distribution system feeders with sufficient redundancy to accommodate repair and maintenance activities over the life of the substation. Highlights of the proposed GIS Project design include: o Up to three (3) 33.6 MVA at 65, 69-12kV transformers (with load tap changers). o One (1) 69 kV GIS ring bus that is arranged so that all three transformers would remain in service in the event a fault occurs on one of the three incoming 69 kV line. o Up to three (3) 15 kV rated enclosed air-insulated Arc-Resistant switchgear. Each switchgear lineup is arranged in a main-transfer bus configuration with four feeders, a tie between main and transfer bus with mobile substation connection, and capacitor bank. o Two (2) underground 69 kV supply lines and duct capacity for three (3) lines. o 69 kV and 12 kV Power Cable Pits and Conduits to accommodate twelve (12) outgoing, underground 12 kV feeders and three underground 69 kV transmission lines. AIS Project The estimated scope of work includes engineering, procurement and construction of the proposed substation with ultimate design with three (3) 33.6 MVA 69/12 kV transformers, incorporation of two or three existing 69kV ties and open air 69kV bus sections, and a three (3) section 12kV switchgear inside a metal clad walk-in enclosure or enclosed CMU structure, to be specified in RFP. The 12kV sectionalized switchgear to be installed will be main-transfer or double bus-double breaker scheme switchgear configuration with twelve outgoing, 12kV underground rated distribution system feeders with sufficient redundancy to accommodate repair and maintenance activities over the life of the substation. Please note that the third line, bus section, transformer, and switchgear section are not part of the scope for this project but shall be considered for future expansion of the substation. Highlights of the proposed AIS Project design include: o Two (2) 33.6 MVA at 65, 69-12kV transformers (with load tap changers) with associated connections to the outdoor 69kV disconnect switches and 12kV switchgear. o Two (2) 15 kV rated enclosed air-insulated Arc-Resistant switchgear sections. Each switchgear lineup is arranged in a main-transfer or double bus-double breaker configuration with four feeders, a tie between main and transfer bus with mobile substation connection, and outdoor capacitor bank. The switchgear lineup shall be part of a walk-in switchgear or CMU building. The switchgear lineups should be configured such that a third lineup can be added in the future o Cable Pits and/or Conduits to accommodate eight outgoing, underground 12 kV feeders The City of Burbank reserves the right to modify the Scope of Work and/or the location of the proposed GIS Project or AIS Project. The firms awarded the Engineer, Procure, and Construct (EPC) / Design/Build contracts for either the GIS Project or the AIS Project, shall furnish all engineering, design, equipment, construction, complete installation, commissioning, testing and energization at the GIS Project or AIS Project, as applicable. If a firm is awarded both projects, it must have the ability to complete each project independently and on schedule. They are also committed to provide an aesthetically pleasing, safe, reliable, energy efficient, low noise, functional, environmentally friendly, operational and ready-in-service new 69-12KV Substation. The Scope of Work at both substations includes the engineering, furnishing and installing of all equipment, required foundations, structures, grounding, lighting, shielding, cable and conduit, trenches, AC/DC system, protection and control system, security, demolition of existing commercial structures and site clearance, site development, fencing (only at the GIS Project) and other auxiliary systems. CONSTRUCTION BUDGET: The Construction Budget for the projects are as follows: o GIS Project is estimated to be sixteen million dollars ($16,000,000) o AIS Project is estimated to be six million dollars ($6,000,000) The Construction Schedules are estimated as follows: o GIS Project is estimated to be a maximum of eighteen (18) months o AIS Project is estimated to be a maximum of twelve (12) months o Project durations begin from issuance of notice to proceed through final acceptance and specifically includes ALL Punch list items o GIS Project and AIS Project schedules are independent and may start at different times Pre-Bid Meeting No License Requirements A - General Engineering Contractor Bid Valid One year Online Q&A Yes Q&A Deadline 01/08/2021 4:00 PM (PST) The City reserves the right to alter the budget and/or schedule for any of the projects.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents