Similar Projects
KCS NASA Causeway Shoreline Repairs
Term Contract
Bidding

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Bidding

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Old Bainbridge Road Safety Improvements SR 63 to County Line and at Knots Lane
Results
Less than $552,578 est. value
Tallahassee, FL 32308

Design-Build Services for Capital Cascades Trail-Skateable Art Project
Results
Tallahassee, FL 32301

High Friction Surface Treatment (HFST) Synthesis for Florida Pavements
Term Contract
Results
Tallahassee, FL 32399

Brandon Hill Drainage Improvements Project
Results
Less than $661,257 est. value
Tallahassee, FL

Meridian Road Drainage Improvements Project
Results
Less than $2,945,626 est. value
Tallahassee, FL 32308

Thomas P. Smith W.R.F. Effluent Storage Pond #6 Reconstruction Linner Replacement
Results
Less than $998,928 est. value
Tallahassee, FL

Resurfacing
Results
Less than $9,268,911 est. value
FL

Welaunee Boulevard Segment 3A and Segment 2 Turn Lanes Construction Project
Results
Tallahassee, FL 32308

Drainage Repairs
Results
Less than $300,000 est. value

Safety Project/Add Turn Lanes/Traffic Signals/Drainage Improvements
Results
Less than $265,041 est. value

Welaunee Boulevard Segment 3B Construction Project
Results
Tallahassee, FL 32308

Last Updated 06/08/2021 02:04 PM
Project Title

Pine Forest Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Tallahassee, FL   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project consists of furnishing all labor, equipment and materials for construction of storm drain improvements within the Pine Forest subdivision and reconstruction of a city-owned Stormwater Management Facility. The major items of work are drainage pipes and structures, excavation, roadway reconstruction, sodding, and water and sanitary sewer adjustments.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 22 - Plumbing.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents