Similar Projects
I-75 MLK DDI
Bidding
FL

East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

City Parking Lot Projects
Post-Bid
Plant City, FL 33563

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Concrete Curbs, Sidewalks and Driveways - Various Locations
Results
Plant City, FL 33563

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)
Bidding
$2,249,150 est. value
Ruskin, FL 33570

County-Wide Sidewalk Repair Services
Post-Bid
Less than $6,000,000 est. value
FL

Pedestrian Crossing Signals/Lighting/Milling and Resurfacing
Results
Less than $1,323,800 est. value
FL

Construction, Bruce B. Downs Boulevard Intersections and Sidewalk Improvements
Post-Bid
$3,776,048 est. value
Tampa, FL 33608

Pedestrian Safety Improvements
Results
$323,400 est. value
FL

FY19 CDBG Area Proposed Sidewalk Improvements Design-Build
Results
Less than $735,407 est. value
Temple Terrace, FL 33617

Sidewalks Construction Near Kenly Elementary - Various Locations (LAP)
Results
Less than $346,108 est. value
Tampa, FL 33619

Sidewalks Near Mort Elementary - Various Locations (LAP)
Results
Less than $573,976 est. value
Tampa, FL 33613

Sidewalk Construction - Gibsonton Elementary (LAP)
Results
Less than $346,198 est. value
Gibsonton, FL 33534

Last Updated 08/25/2020 01:37 PM
Project Title

East Columbus Drive from North Nebraska Avenue (SR45) to 14th Street Bike Lane/Sidewalk FDOT LAP

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,011,394
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance of traffic, asphalt pavement milling, asphalt pavement, signing and pavement markings, signalization, utilities adjustments/relocations, drainage improvements, concrete driveway, sidewalk, curb and gutter, landscaping and all associated work required for a complete project in accordance with the contract.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents