Similar Projects
Last Updated | 10/05/2022 11:36 AM |
Project Title | Campus Deferred Maintenance - Air Handler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Los Angeles, CA 90095 (Los Angeles County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,999,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope includes the provision of temporary HVAC equipment to provide uninterrupted service during the replacement of the AHUs at each location, followed by demolition and removal of old AHUs and provision of new, energy efficient AHUs in their place. Supporting work shall include hazardous materials abatement; HVAC ductwork; chilled water and heating hot water reconnections; HVAC controls; electrical power installation; mechanical insulation; structural improvement for air handler support; and minor architectural work to allow for equipment ingress and egress.For further information, contact John Stephenson at: (310) 579-5180. Pre-bid meeting: 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) Find your local number: https://ucla.zoom.us/u/az8tAn4Td |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |