Similar Projects
Johns Lake Landing - Mixed-Use Developement
New Construction - 370,000 SF
Conception
$58,000,000 est. value
Clermont, FL

Hodges Reserve
New Construction
Conception
Leesburg, FL

The Vue at Clermont
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Clermont, FL 34711

Costco / Clermont
New Construction, Infrastructure - 151,000 SF
Design
$12,000,000 CJ est. value
Clermont, FL 34711

7-Eleven #42219 / Eustis
New Construction, Infrastructure - 5,254 SF
Bidding
$900,000 CJ est. value
Eustis, FL 32736

Site and Utilities Installation Contract Holly Creek Phase II B
Infrastructure
Bidding
$1,500,000 CJ est. value
Mount Dora, FL 32757

7-Eleven #42219 / Eustis
New Construction, Infrastructure - 5,254 SF
Post-Bid
$900,000 CJ est. value
Eustis, FL 32736

Holiday Inn Express / Mount Dora
New Construction, Infrastructure - 53,545 SF
Post-Bid
$14,000,000 CJ est. value
Mount Dora, FL 32757

Lake Denham Muck Farm Restoration
Infrastructure
Results
Leesburg, FL 34748

Lake Ella Road Safety Improvements
Infrastructure
Results
$1,041,727 CJ est. value
Fruitland Park, FL 34731

The Sanctuary
New Construction
Construction
Clermont, FL 34714

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Turnpike Logistics Center
New Construction, Infrastructure - 977,000 SF
Pending Verification
$63,500,000 CJ est. value
Groveland, FL 34736

Cypress Reserve Planned Unit Development
New Construction
Pending Verification
Groveland, FL

Hampton Park
New Construction
Conception
Groveland, FL

Last Updated 02/07/2023 02:22 PM
Project Title

Arbor Park - Phase 2 & 3

Physical Address View project details and contacts
City, State (County) Fruitland Park, FL 34731   (Lake County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $120,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a subdivision in three phases: Phase 1 consists of 162 lots Phase 2 and 3 consists of 347 lots As of February 7, 2023, Arbor Park has received preliminary plat approval. A final plat application has not been submitted for Phase 2 of 3 to the City of Fruitland Park. A home builder has been selected. Interested subcontractors may contact Park Square Homes to be added to the bid list. Although a timeline for construction has not been released, contraction is not expected to commence prior to 2024.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents