Similar Projects
Riley Road Improvements - 36621 - Torrance County
Infrastructure
Conception
$1,900,000 CJ est. value
Espanola, NM 87532

NM 74 - PoPay Avenue Intersection Project
Infrastructure
Bidding
$1,052,575 CJ est. value
Ohkay Owingeh, NM 87566

Los Pinos Bridge Project
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Tierra Amarilla, NM 87575

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Acequia De La Canova Culvert Replacement Project
Infrastructure
Results
$55,403 CJ est. value
Canova, NM 87582

Voluntary Public Access- Habitat Initiative
Infrastructure
Construction
Santa Fe, NM 87506

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2022
Infrastructure
Post-Bid
$100,000 CJ est. value
Espanola, NM 87532

RFQ/P Contractor - Construction of a New Community and Wellness Center
New Construction, Infrastructure - 8,758 SF
Post-Bid
$2,178,975 CJ est. value
Ohkay Owingeh, NM 87566

RFP D/B - Santa Clara Pueblo Tribal Administration Complex
New Construction, Infrastructure
Post-Bid
$13,200,000 CJ est. value
Espanola, NM 87532

RFQ Contractors - 382 Fencing
Infrastructure
Post-Bid
$600,000 CJ est. value
Espanola, NM 87532

MB Community Ditch Association Rio Chamita Diversion Dam
New Construction, Infrastructure
Post-Bid
$318,778 CJ est. value
Chama, NM 87520

Installation of a Livestock Pipeline, Drinking Troughs and Storage Tanks
Infrastructure
Post-Bid
$875,000 CJ est. value
Abiquiu, NM 87510

Roadway Reconstruction
Infrastructure
Post-Bid
$600,000 CJ est. value
Tierra Amarilla, NM 87551

New Construction Services - Multiple Single-Family Homes
New Construction, Infrastructure
Post-Bid
$64,000 CJ est. value
Ohkay Owingeh, NM 87566

Last Updated 03/01/2023 11:30 AM
Project Title

Sebastian Martin - Black Mesa Watershed Dam Site No - 18 Sediment Removal

Physical Address View project details and contacts
City, State (County) Alcalde, NM 87566   (Rio Arriba County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $246,699 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of Jan 10 the project was awarded to Sichler Construction LLC, awarded amount not available. The project involves the excavation and removal of accumulated sediment from the upstream side of the Sebastian Martin - Black Mesa Watershed Dam Site #18 in Alcalde, New Mexico, and the associated disposal of this sediment on an undeveloped parcel of land owned by Rio Arriba County adjacent to the Alcalde Elementary School. Bidders on this project must be licensed New Mexico Contractors. All bidders must indicate their current New Mexico Contractor's License Number and classification on the outside of the sealed envelope. Working time for this Contract is sixty (60) calendar days. Time will be counted from the date of Notice to Proceed. Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions. Each proposal must be accompanied by a certified check or a Bid Bond acceptable to the Upper Rio Grande Watershed District in an amount which shall be not less than five percent (5%) of the amount of the bid, payable without condition to the Upper Rio Grande Watershed District as a guarantee that the bidder, if awarded the contract, will, within forty-five (45) days, execute such contract in accordance with the proposal and in the manner and form required by the contract documents and will furnish good and sufficient bond for the faithful performance of the same, and for payment for all labor and material.The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The successful bidder, simultaneously with the execution of the contract, will be required to furnish a faithful Performance Bond in an amount equal to one hundred percent (100%) of the contract amount and a Labor and Material Payment Bond equal to one hundred percent (100%) of the contract amount.The said bonds shall be secured from a surety company satisfactory to the Upper Rio Grande Watershed District, authorized to do business in the State of New Mexico, and shall be listed as a surety company acceptable for Federal Bonds by the U.S. Department of the Treasury as published in the Federal Register Circular 570, 1989 Revision, and shall cover construction contracts in excess of Two Million Dollars ($2,000,000). The forms of the bonds of the successful bidder will be required to execute are included in the contract documents. The Owner reserves the right to accept or reject any or all Proposals or Bids, to waive technicalities, to make any investigation deemed necessary of a Bidder's ability to perform the work covered by the Specifications, and to accept what in the judgement of the Owner is the best bid.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents