Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Water Main Improvements
Infrastructure
Bidding
$1,740,000 est. value
Yelm, WA

Zone 3 West Transmission Main
Term Contract, Alteration
Bidding
Kennewick, WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Albion Drive Roundabout Improvements
Demolition, Alteration
Bidding
WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Central Avenue ,Main Street Resurfacing and Deerpath ,Kay Water Main Improvements
Infrastructure
Bidding
$600,000 to $700,000 est. value
Oroville, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Tolt Pipeline No 1 Rehabilitation
Infrastructure
Post-Bid
$3,100,000 est. value
Duvall, WA 98019

Last Updated 12/17/2021 06:14 PM
Project Title

Water Pump Station Meter and Zone One PRV Replacement

Physical Address View project details and contacts
City, State (County) Kennewick, WA 99336   (Benton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 to $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to replace and relocate a 29 12-inch PRV located on E. 36th Ave. between S. Gum St. and S. Date St. with a 30 new packaged system. Additional work includes replacing two 36-inch water 31 meters and one 12-inch water meter located at the Water Treatment Plant, 32 replacing a 24-inch water meter at the Ranney Collector No. 5, and installing a new 24-inch water meter and vault at 1501 W. 19 33 th Ave. Additional work will 34 include furnishing all labor, tools, materials, and equipment required for 35 completion of the improvements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents