Similar Projects
New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road)
Term Contract
Results
Fort Edward, NY

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

North Tonawanda Downtown Placemaking
Post-Bid
North Tonawanda, NY 14120

North Creek Streetscape and Water Infrastructure Project
Results
Lake George, NY 12845

Broome Developmental Center - Concrete Entrance Walkway
Post-Bid
Binghamton, NY 13905

LFTC Sidewalk Connection and Complete Streets/Blacksmith Square Drive Sidewalk Project
Term Contract
Results
Ballston Spa, NY 12020

Hector Street Complete Street
Term Contract
Post-Bid
Less than $5,000,000 est. value
Ithaca, NY 14850

CDBG South Troy Neighborhood Reinvestment Project - Sidewalks and Curbs - Phase 1 and 2
Results
Troy, NY

Parking Lot Improvements at Dutchess County Stadium
Post-Bid
Wappingers Falls, NY 12590

Canalway Trail Lock E-18 To Route 167 On The Erie Canal
Results
Little Falls, NY 13365

Concrete Sidewalks and Curb
Post-Bid
Carmel, NY 10512

Last Updated 04/14/2021 09:17 AM
Project Title

CDGB Tilden Street - Starbuck Avenue Sidewalk Repair

Physical Address View project details and contacts
City, State (County) Watertown, NY 13601   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project sites are located on the 400 and 500 blocks of Tilden Street and on the 600 and 700 blocks of Starbuck Avenue in the City. The successful contractor will be required to provide all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown. Removal and disposal of the existing sidewalks and unsuitable sub-base material as shown on the Contract Drawings and as directed by the City Engineer. Excavate to new sub-grade, install and compact new sub-base material as shown on the Contract Drawings. Replace 9,800 SQFT of Sidewalks. Install concrete sidewalks, retaining walls, and driveway asphalt were directed and as shown on the Contract Drawings. Newly constructed sidewalks, retaining walls, aprons, and curbs are to match what was originally on site, unless directed to do otherwise by the Planning or Engineering Departments. All concrete to be 4,000 PSI. The contractor is to remove, and replace all retaining walls, stairs, and fences that are in the way of installing the new sidewalk blocks, as indicated on drawings. Site restoration of soft surface and hard surface will be performed where directed and as shown within the details. Provide traffic control and daily maintenance of adjoining streets and areas. Coordinate with the local utility companies in conjunction with any relocation of existing facilities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents