Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road)
Term Contract
Results
Fort Edward, NY

One Lagrange Avenue Parking Lot Renovations
Results
Poughkeepsie, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Downtown White Plains Transit District Pedestrian and Bicycle Improvement
Term Contract
Post-Bid
White Plains, NY 10601

North Creek Streetscape and Water Infrastructure Project
Results
Lake George, NY 12845

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

CDBG South Troy Neighborhood Reinvestment Project - Sidewalks and Curbs - Phase 1 and 2
Results
Troy, NY

North Tonawanda Downtown Placemaking
Post-Bid
North Tonawanda, NY 14120

Canalway Trail Lock E-18 To Route 167 On The Erie Canal
Results
Little Falls, NY 13365

Broome Developmental Center - Concrete Entrance Walkway
Post-Bid
Binghamton, NY 13905

Heatherdell Road Sidewalk Improvement
Results
Ardsley, NY 10502

Hector Street Complete Street
Term Contract
Post-Bid
Less than $5,000,000 est. value
Ithaca, NY 14850

Last Updated 03/30/2020 04:32 PM
Project Title

LFTC Sidewalk Connection and Complete Streets/Blacksmith Square Drive Sidewalk Project

Physical Address View project details and contacts
City, State (County) Ballston Spa, NY 12020   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of clearing, grubbing, grading, drainage, sidewalk and multi-use path installation, box-out widening, curbing, mill and fill, and signing and striping along Route 9 between Stonebreak Road and Dunning Street. The project includes installation of granite curbing, raised medians, dry wells, pedestrian lighting, signing and striping, and Rectangular Rapid Flashing Beacons (RRFBs).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents