Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road)
Term Contract
Results
Fort Edward, NY

One Lagrange Avenue Parking Lot Renovations
Results
Poughkeepsie, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Downtown White Plains Transit District Pedestrian and Bicycle Improvement
Term Contract
Post-Bid
White Plains, NY 10601

North Creek Streetscape and Water Infrastructure Project
Results
Lake George, NY 12845

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

LFTC Sidewalk Connection and Complete Streets/Blacksmith Square Drive Sidewalk Project
Term Contract
Results
Ballston Spa, NY 12020

Broome Developmental Center - Concrete Entrance Walkway
Post-Bid
Binghamton, NY 13905

CDBG South Troy Neighborhood Reinvestment Project - Sidewalks and Curbs - Phase 1 and 2
Results
Troy, NY

Hector Street Complete Street
Term Contract
Post-Bid
Less than $5,000,000 est. value
Ithaca, NY 14850

Canalway Trail Lock E-18 To Route 167 On The Erie Canal
Results
Little Falls, NY 13365

Parking Lot Improvements at Dutchess County Stadium
Post-Bid
Wappingers Falls, NY 12590

Reported 12/07/2019 12:00 AM
Project Title

North Tonawanda Downtown Placemaking

Physical Address View project details and contacts
City, State (County) North Tonawanda, NY 14120   (Niagara County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project has been funded by Empire State Development with the intention of creating a stronger sense of place in the downtown North Tonawanda district. Improvements support walkability, traffic calming, wayfinding and community branding. The construction scope includes; Roadway and Sidewalk Improvements: Intersection construction, curbs and curb extensions, concrete crosswalks. asphalt patch and repair, utility relocations Where required Vegetation Improvements: Street trees in structural soil on Webster St. Main St and at Charles Fleischmann Park at the intersection Of Main, Webster and Goundry Streets Wayfinding Improvements: Lighted Gateway Monument sign, lighted secondary gateway signs. neighborhood directional signs. downtown wayfinding Interpretive Sign Placemaking Improvements: Clock tower, flagpole and site furniture at Charles Fleischmann Park, street furniture on Webster Street. and feature lighting and public art at Manhattan Street Parking Lot walkway. Placemaking Improvements: Clock tower, flagpole and site furniture at Charles Fleischmann Park, street furniture on Webster Street, and feature lighting and public art at Manhattan Street Parking Lot walkway.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents