Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road)
Term Contract
Results
Fort Edward, NY

One Lagrange Avenue Parking Lot Renovations
Results
Poughkeepsie, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Downtown White Plains Transit District Pedestrian and Bicycle Improvement
Term Contract
Post-Bid
White Plains, NY 10601

North Creek Streetscape and Water Infrastructure Project
Results
Lake George, NY 12845

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

LFTC Sidewalk Connection and Complete Streets/Blacksmith Square Drive Sidewalk Project
Term Contract
Results
Ballston Spa, NY 12020

North Tonawanda Downtown Placemaking
Post-Bid
North Tonawanda, NY 14120

CDBG South Troy Neighborhood Reinvestment Project - Sidewalks and Curbs - Phase 1 and 2
Results
Troy, NY

Broome Developmental Center - Concrete Entrance Walkway
Post-Bid
Binghamton, NY 13905

Heatherdell Road Sidewalk Improvement
Results
Ardsley, NY 10502

Hector Street Complete Street
Term Contract
Post-Bid
Less than $5,000,000 est. value
Ithaca, NY 14850

Last Updated 01/08/2020 12:22 PM
Project Title

Canalway Trail Lock E-18 To Route 167 On The Erie Canal

Physical Address View project details and contacts
City, State (County) Little Falls, NY 13365   (Herkimer County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install temporary erosion and sediment control devices prior to disturbing any areas; Install work zone traffic control signage; Clear as necessary, cut trees, excavate and grade to construct a 10-foot wide asphalt shared use path; Construct swales and ditches, and install storm pipes and culverts for drainage; Rehabilitate existing bridge, remove existing deck and replace with Glulam Timber Bridge Deck System, install bridge rail system; Construct GRS retaining walls, bridge abutments, and single span prestressed concrete solid slab unit pedestrian bridges; Install railing systems, ROW fencing and landscaping for the proposed trail; Reconstruct and resurface portions of Lock E-18 access road and parking area; Install signage and pavement markings on the trail at all public road crossings, along Lock E-18 access road terminus, along length of proposed project trail, and at confluence with existing Empire State Trail system; Landscaping including planting trees and shrubs; Remove temporary erosion and sediment control devices upon completion of permanent stabilization of all disturbed areas; Remove work zone traffic signage control

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents