Similar Projects
Last Updated | 01/08/2020 12:20 PM |
Project Title | Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road) |
Physical Address | View project details and contacts |
City, State (County) | Fort Edward, NY (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitate existing Canalway pedestrian/bicycle trail tie-in portions; construct new Canalway pedestrian/bicycle trail segment from Old Champlain Feeder Canal (terminus of the existing paved pedestrian-bicycle trail adjacent to the confluence of the Glens Falls Feeder Canal and Old Champlain Canal) in the Town of Fort Edward to the intersection of Tow Path Road and New Swamp Road in the Town of Kingsbury construct several prefabricated steel truss pedestrian-bicycle bridge segments with H-Pile and spread footing foundations and cast-in-place concrete substructures/wingwalls; install precast concrete pedestrian-bicycle box culvert under RT 196 with precast concrete wingwalls and GRES retaining walls; perform clearing and grubbing operations; perform excavation, grading and slope filling operations; prepare subgrade, install and grade subbase materials, install crusher run stone surface course, perform asphalt paving operations; and install fencing, bridge railing and landscaping items. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |