Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

One Lagrange Avenue Parking Lot Renovations
Results
Poughkeepsie, NY

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

North Creek Streetscape and Water Infrastructure Project
Results
Lake George, NY 12845

Downtown White Plains Transit District Pedestrian and Bicycle Improvement
Term Contract
Post-Bid
White Plains, NY 10601

LFTC Sidewalk Connection and Complete Streets/Blacksmith Square Drive Sidewalk Project
Term Contract
Results
Ballston Spa, NY 12020

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

CDBG South Troy Neighborhood Reinvestment Project - Sidewalks and Curbs - Phase 1 and 2
Results
Troy, NY

North Tonawanda Downtown Placemaking
Post-Bid
North Tonawanda, NY 14120

Canalway Trail Lock E-18 To Route 167 On The Erie Canal
Results
Little Falls, NY 13365

Broome Developmental Center - Concrete Entrance Walkway
Post-Bid
Binghamton, NY 13905

Heatherdell Road Sidewalk Improvement
Results
Ardsley, NY 10502

Hector Street Complete Street
Term Contract
Post-Bid
Less than $5,000,000 est. value
Ithaca, NY 14850

Last Updated 01/08/2020 12:20 PM
Project Title

Rehabilitation/Construction of Canalway Trail - Fort Edward (GFFC) to Kingsbury (New Swamp Road)

Physical Address View project details and contacts
City, State (County) Fort Edward, NY   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate existing Canalway pedestrian/bicycle trail tie-in portions; construct new Canalway pedestrian/bicycle trail segment from Old Champlain Feeder Canal (terminus of the existing paved pedestrian-bicycle trail adjacent to the confluence of the Glens Falls Feeder Canal and Old Champlain Canal) in the Town of Fort Edward to the intersection of Tow Path Road and New Swamp Road in the Town of Kingsbury construct several prefabricated steel truss pedestrian-bicycle bridge segments with H-Pile and spread footing foundations and cast-in-place concrete substructures/wingwalls; install precast concrete pedestrian-bicycle box culvert under RT 196 with precast concrete wingwalls and GRES retaining walls; perform clearing and grubbing operations; perform excavation, grading and slope filling operations; prepare subgrade, install and grade subbase materials, install crusher run stone surface course, perform asphalt paving operations; and install fencing, bridge railing and landscaping items.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents